Hyderabad: Union minister G. Kishan Reddy performed an on-site inspection of the Amberpet Flyover, strolling its duration from Golnaka Church to Vani Picture Studio. He accumulated detailed updates from officers representing Roads & Structures (R&B), Nationwide Highways (RO), Better Hyderabad Municipal Company (GHMC), Water Works, Electrical energy, and Earnings Departments.
All through a press briefing, minister Reddy highlighted the undertaking’s historical past and present demanding situations:
Ancient Context:
He recalled that throughout N.T. Rama Rao’s tenure, the Chaderghat-Warangal nationwide freeway was once widened, however the Amberpet segment was once excluded because of adjoining cemeteries.
As each an MLA and MP for Amberpet, he initiated the flyover undertaking, securing rapid approval and investment from Top Minister.
Present Delays:
Reddy emphasized that land acquisition, a state govt duty, is the main impediment.
He criticised each the former BRS and present Congress governments for delays in obtaining land at 5 closing places.
He cited a selected example the place land was once no longer passed over in spite of a Rs 2.51 crore fee.
He reminded that he despatched letters to each KCR, and Revanth reddy, in regards to the land aquisition.
Undertaking Development:
He lately convened a high-level assembly, teaching officers to prioritise the development of a top quality highway underneath the flyover, at the side of landscaping and beautification.
He defined a phased method: first, opening the flyover to divert site visitors, adopted by way of highway development and beautification under.
He mentioned that Rs 338 crore has already been invested within the undertaking.
Timeline and Advantages:
Minister Reddy introduced that site visitors might be allowed at the flyover beginning this Maha Shivaratri, offering rapid reduction to commuters.
Building of the street underneath the flyover, and beautification, will begin after the flyover opens.
He reiterated that well timed land handover by way of the state govt is an important for the undertaking’s swift of completion.







